US Bridges

LA0010 over Comite River Relief #2

Fair

East Feliciana Parish, Louisiana · 1.19 MI West JCT LA 67 · Structure no. 611900610512381

Built
2005
20 years old
Condition
Fair
inspected December 2023
Type
Slab
Concrete
Length
120 ft
6 main spans
Daily traffic
3,904
2021 count
Owner
State
State Highway Agency

About this bridge

LA0010 over Comite River Relief #2 is a concrete slab carrying LA0010 over Comite River Relief #2 in East Feliciana Parish, Louisiana. It was built in 2005, so it is 20 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,904 vehicles a day, roughly 18% of them trucks, projected to reach 4,294 by 2041. The structure is 120 ft (36.6 m) long and 47 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesLA0010
CrossesComite River Relief #2
Location1.19 MI West JCT LA 67
RouteState Highway 10
Coordinates30.86155, -91.03311
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span20 ft (6.1 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,904 (2021)
Projected traffic4,294 by 2041
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was LA0010 over Comite River Relief #2 built?

It was built in 2005, making it 20 years old in 2025.

What condition is LA0010 over Comite River Relief #2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does LA0010 over Comite River Relief #2 carry?

About 3,904 vehicles per day (2021 count), of which roughly 18% are trucks.

How long is LA0010 over Comite River Relief #2?

The structure is 120 ft (36.6 m) long with a longest span of 20 ft (6.1 m) and a deck 47 ft wide.

Who owns LA0010 over Comite River Relief #2?

It is owned by the State Highway Agency.