Garrie Cut-Off over Hampton Coulee
FairPosted for loadCalcasieu Parish, Louisiana · 2.8 MI East of LA 109 · Structure no. 071030145933551
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 32 ft
- 2 main spans
- Daily traffic
- 558
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Garrie Cut-Off over Hampton Coulee is a wood or timber stringer/multi-beam or girder carrying Garrie Cut-Off over Hampton Coulee in Calcasieu Parish, Louisiana. It was built in 1960, so it is 65 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 558 vehicles a day, projected to reach 613 by 2041. The structure is 32 ft (9.8 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garrie Cut-Off over Hampton Coulee built?
It was built in 1960, making it 65 years old in 2025.
What condition is Garrie Cut-Off over Hampton Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Garrie Cut-Off over Hampton Coulee carry?
About 558 vehicles per day (2021 count).
How long is Garrie Cut-Off over Hampton Coulee?
The structure is 32 ft (9.8 m) long with a longest span of 16 ft (4.9 m) and a deck 28 ft wide.
Who owns Garrie Cut-Off over Hampton Coulee?
It is owned by the County Highway Agency.