US Bridges

Hereford RD over Tete Bayou

Fair

Caddo Parish, Louisiana · 4.7 MI W of HWY 538 · Structure no. 040932407940151

Built
1979
46 years old
Condition
Fair
inspected March 2023
Type
Slab
Concrete
Length
58 ft
3 main spans
Daily traffic
58
2019 count
Owner
County
County Highway Agency

About this bridge

Hereford RD over Tete Bayou is a concrete slab carrying Hereford RD over Tete Bayou in Caddo Parish, Louisiana. It was built in 1979, so it is 46 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 58 vehicles a day, projected to reach 63 by 2039. The structure is 58 ft (17.7 m) long and 31 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesHereford RD
CrossesTete Bayou
Location4.7 MI W of HWY 538
RouteCounty Highway 0
Coordinates32.67815, -94.02723
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating38.9 US tons
Inventory rating30 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length58 ft (17.7 m)
Longest span19 ft (5.8 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic58 (2019)
Projected traffic63 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hereford RD over Tete Bayou built?

It was built in 1979, making it 46 years old in 2025.

What condition is Hereford RD over Tete Bayou in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Hereford RD over Tete Bayou carry?

About 58 vehicles per day (2019 count).

How long is Hereford RD over Tete Bayou?

The structure is 58 ft (17.7 m) long with a longest span of 19 ft (5.8 m) and a deck 31 ft wide.

Who owns Hereford RD over Tete Bayou?

It is owned by the County Highway Agency.