US Bridges

Wallace ST over 71st Street Ditch

FairPosted for load

Caddo Parish, Louisiana · 0.2 MI So. of LA 511 · Structure no. 040932262934601

Built
1962
63 years old
Condition
Fair
inspected April 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
300
1979 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wallace ST over 71st Street Ditch is a concrete culvert carrying Wallace ST over 71st Street Ditch in Caddo Parish, Louisiana. It was built in 1962, so it is 63 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 300 vehicles a day, projected to reach 330 by 1999. The structure is 23 ft (7 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWallace ST
Crosses71st Street Ditch
Location0.2 MI So. of LA 511
RouteCounty Highway 0
Coordinates32.43659, -93.76735
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.3 US tons
Inventory rating34.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width40 ft (12.2 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (1979)
Projected traffic330 by 1999
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wallace ST over 71st Street Ditch built?

It was built in 1962, making it 63 years old in 2025.

What condition is Wallace ST over 71st Street Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Wallace ST over 71st Street Ditch carry?

About 300 vehicles per day (1979 count).

How long is Wallace ST over 71st Street Ditch?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m) and a deck 40 ft wide.

Who owns Wallace ST over 71st Street Ditch?

It is owned by the City or Municipal Highway Agency.