US Bridges

LA0113 over Bundick Creek

Fair

Beauregard Parish, Louisiana · 0.92 Mi. North of LA 394 · Structure no. 070600000070229

Built
2013
12 years old
Condition
Fair
inspected July 2023
Type
Slab
Concrete
Length
190 ft
10 main spans
Daily traffic
1,806
2021 count
Owner
State
State Highway Agency

About this bridge

LA0113 over Bundick Creek is a concrete slab carrying LA0113 over Bundick Creek in Beauregard Parish, Louisiana. It was built in 2013, so it is 12 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,806 vehicles a day, roughly 17% of them trucks, projected to reach 1,986 by 2041. The structure is 190 ft (57.9 m) long and 35 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesLA0113
CrossesBundick Creek
Location0.92 Mi. North of LA 394
RouteState Highway 113
Coordinates30.68465, -93.0439
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans10
Design loadHS 20
Structure length190 ft (57.9 m)
Longest span19 ft (5.8 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,806 (2021)
Projected traffic1,986 by 2041
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was LA0113 over Bundick Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is LA0113 over Bundick Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does LA0113 over Bundick Creek carry?

About 1,806 vehicles per day (2021 count), of which roughly 17% are trucks.

How long is LA0113 over Bundick Creek?

The structure is 190 ft (57.9 m) long with a longest span of 19 ft (5.8 m) and a deck 35 ft wide.

Who owns LA0113 over Bundick Creek?

It is owned by the State Highway Agency.