Chatlain Crossing over Bayou Natchitoches
FairPosted for loadAvoyelles Parish, Louisiana · App. 10 M. E. of LA 451 · Structure no. 080531090914451
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 110 ft
- 8 main spans
- Daily traffic
- 150
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Chatlain Crossing over Bayou Natchitoches is a wood or timber stringer/multi-beam or girder carrying Chatlain Crossing over Bayou Natchitoches in Avoyelles Parish, Louisiana. It was built in 2000, so it is 25 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 150 vehicles a day, projected to reach 165 by 2040. The structure is 110 ft (33.5 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chatlain Crossing over Bayou Natchitoches built?
It was built in 2000, making it 25 years old in 2025.
What condition is Chatlain Crossing over Bayou Natchitoches in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Chatlain Crossing over Bayou Natchitoches carry?
About 150 vehicles per day (2020 count).
How long is Chatlain Crossing over Bayou Natchitoches?
The structure is 110 ft (33.5 m) long with a longest span of 14 ft (4.3 m) and a deck 16 ft wide.
Who owns Chatlain Crossing over Bayou Natchitoches?
It is owned by the County Highway Agency.