Levi Gremillion RD over Drainage Ditch
FairPosted for loadAvoyelles Parish, Louisiana · 1.71 Mi. East of LA 107 · Structure no. 080530572915641
- Built
- 1965
- 60 years old, rebuilt 1997
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 34 ft
- 3 main spans
- Daily traffic
- 70
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Levi Gremillion RD over Drainage Ditch is a wood or timber stringer/multi-beam or girder carrying Levi Gremillion RD over Drainage Ditch in Avoyelles Parish, Louisiana. It was built in 1965 and reconstructed in 1997, so it is 60 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 70 vehicles a day, projected to reach 77 by 2040. The structure is 34 ft (10.4 m) long and 18 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Levi Gremillion RD over Drainage Ditch built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1997.
What condition is Levi Gremillion RD over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Levi Gremillion RD over Drainage Ditch carry?
About 70 vehicles per day (2020 count).
How long is Levi Gremillion RD over Drainage Ditch?
The structure is 34 ft (10.4 m) long with a longest span of 12 ft (3.7 m) and a deck 18 ft wide.
Who owns Levi Gremillion RD over Drainage Ditch?
It is owned by the County Highway Agency.