US Bridges

E John Templet RD over New River Canal

Fair

Ascension Parish, Louisiana · 0.01 Mi. N of LA 429 · Structure no. 610330134905241

Built
2001
24 years old
Condition
Fair
inspected January 2023
Type
Slab
Concrete
Length
80 ft
4 main spans
Daily traffic
25
2019 count
Owner
County
County Highway Agency

About this bridge

E John Templet RD over New River Canal is a concrete slab carrying E John Templet RD over New River Canal in Ascension Parish, Louisiana. It was built in 2001, so it is 24 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25 vehicles a day, projected to reach 27 by 2039. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesE John Templet RD
CrossesNew River Canal
Location0.01 Mi. N of LA 429
RouteCounty Highway 0
Coordinates30.22969, -90.87833
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating99 US tons
Inventory rating60 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span20 ft (6.1 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2019)
Projected traffic27 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E John Templet RD over New River Canal built?

It was built in 2001, making it 24 years old in 2025.

What condition is E John Templet RD over New River Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does E John Templet RD over New River Canal carry?

About 25 vehicles per day (2019 count).

How long is E John Templet RD over New River Canal?

The structure is 80 ft (24.4 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.

Who owns E John Templet RD over New River Canal?

It is owned by the County Highway Agency.