NW 39th ST 331 over Trib. to Halfday Creek
GoodShawnee County, Kansas · 1.73E US75 0.87S NW 46th · Structure no. 000890995904220
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 67 ft
- 3 main spans
- Daily traffic
- 550
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NW 39th ST 331 over Trib. to Halfday Creek is a concrete culvert carrying NW 39th ST 331 over Trib. to Halfday Creek in Shawnee County, Kansas. It was built in 2020, so it is 5 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 550 vehicles a day, roughly 1% of them trucks, projected to reach 600 by 2041. The structure is 67 ft (20.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW 39th ST 331 over Trib. to Halfday Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is NW 39th ST 331 over Trib. to Halfday Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does NW 39th ST 331 over Trib. to Halfday Creek carry?
About 550 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is NW 39th ST 331 over Trib. to Halfday Creek?
The structure is 67 ft (20.4 m) long with a longest span of 25 ft (7.7 m).
Who owns NW 39th ST 331 over Trib. to Halfday Creek?
It is owned by the County Highway Agency.