N.W. 39th. St. 194 over Halfday Creek
GoodPosted for loadShawnee County, Kansas · 1.0E US75 1.7N US24 · Structure no. 000890995304220
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 108 ft
- 3 main spans
- Daily traffic
- 550
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
N.W. 39th. St. 194 over Halfday Creek is a concrete continuous slab carrying N.W. 39th. St. 194 over Halfday Creek in Shawnee County, Kansas. It was built in 2001, so it is 24 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 550 vehicles a day, roughly 1% of them trucks, projected to reach 600 by 2040. The structure is 108 ft (32.8 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N.W. 39th. St. 194 over Halfday Creek built?
It was built in 2001, making it 24 years old in 2025.
What condition is N.W. 39th. St. 194 over Halfday Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does N.W. 39th. St. 194 over Halfday Creek carry?
About 550 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is N.W. 39th. St. 194 over Halfday Creek?
The structure is 108 ft (32.8 m) long with a longest span of 43 ft (13 m) and a deck 32 ft wide.
Who owns N.W. 39th. St. 194 over Halfday Creek?
It is owned by the County Highway Agency.