NW Wilson Rd. over Trib. to Halfday Creek
GoodShawnee County, Kansas · 3.5N of Elmont · Structure no. 000890995004082
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 80
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NW Wilson Rd. over Trib. to Halfday Creek is a concrete culvert carrying NW Wilson Rd. over Trib. to Halfday Creek in Shawnee County, Kansas. It was built in 2021, so it is 4 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 80 vehicles a day, projected to reach 100 by 2041. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW Wilson Rd. over Trib. to Halfday Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is NW Wilson Rd. over Trib. to Halfday Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does NW Wilson Rd. over Trib. to Halfday Creek carry?
About 80 vehicles per day (2024 count).
How long is NW Wilson Rd. over Trib. to Halfday Creek?
The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m).
Who owns NW Wilson Rd. over Trib. to Halfday Creek?
It is owned by the County Highway Agency.