NW 94th. St. 312 over Halfday Creek
FairPosted for loadShawnee County, Kansas · 0.2E of U S 75 Highway · Structure no. 000890993204080
- Built
- 1940
- 85 years old, rebuilt 1979
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 39 ft
- 1 main span
- Daily traffic
- 200
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NW 94th. St. 312 over Halfday Creek is a steel stringer/multi-beam or girder carrying NW 94th. St. 312 over Halfday Creek in Shawnee County, Kansas. It was built in 1940 and reconstructed in 1979, so it is 85 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 200 by 2040. The structure is 39 ft (12 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW 94th. St. 312 over Halfday Creek built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1979.
What condition is NW 94th. St. 312 over Halfday Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does NW 94th. St. 312 over Halfday Creek carry?
About 200 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is NW 94th. St. 312 over Halfday Creek?
The structure is 39 ft (12 m) long with a longest span of 38 ft (11.7 m) and a deck 30 ft wide.
Who owns NW 94th. St. 312 over Halfday Creek?
It is owned by the County Highway Agency.