US Bridges

Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235

Good

Sedgwick County, Kansas · Ramp NB235-WB13 · Structure no. 999923500877991

Built
2014
11 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
2,280 ft
5 main spans
Daily traffic
7,977
2023 count
Owner
State
State Highway Agency

About this bridge

Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235 is a steel continuous stringer/multi-beam or girder carrying Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235 in Sedgwick County, Kansas. It was built in 2014, so it is 11 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,977 vehicles a day. The structure is 2,280 ft (695 m) long and 33 ft wide.

CarriesRamp NB235-WB13
CrossesRmp Levrd Wichfldwy I235
LocationRamp NB235-WB13
RouteState Highway 81
StateKansas
Coordinates37.70833, -97.40889
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

MaterialSteel Continuous
DeckNot applicable
Main spans5 (+4 approach)
Design loadHL 93
Structure length2,280 ft (695 m)
Longest span225 ft (68.6 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,977 (2023)
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235 built?

It was built in 2014, making it 11 years old in 2025.

What condition is Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235 carry?

About 7,977 vehicles per day (2023 count).

How long is Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235?

The structure is 2,280 ft (695 m) long with a longest span of 225 ft (68.6 m) and a deck 33 ft wide.

Who owns Ramp NB235-WB13 over Rmp Levrd Wichfldwy I235?

It is owned by the State Highway Agency.