US Bridges

Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy

Good

Sedgwick County, Kansas · Ramp EB13-SB235 · Structure no. 999923500877981

Built
2014
11 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,698 ft
5 main spans
Daily traffic
6,511
2023 count
Owner
State
State Highway Agency

About this bridge

Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy is a steel continuous stringer/multi-beam or girder carrying Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy in Sedgwick County, Kansas. It was built in 2014, so it is 11 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,511 vehicles a day. The structure is 1,698 ft (517.5 m) long and 33 ft wide.

CarriesRamp EB13-SB 235
CrossesRamp Lev RD Wichita Fdwy
LocationRamp EB13-SB235
RouteState Highway 81
StateKansas
Coordinates37.70806, -97.40917
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialSteel Continuous
DeckNot applicable
Main spans5 (+4 approach)
Design loadHL 93
Structure length1,698 ft (517.5 m)
Longest span225 ft (68.6 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,511 (2023)
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy built?

It was built in 2014, making it 11 years old in 2025.

What condition is Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy carry?

About 6,511 vehicles per day (2023 count).

How long is Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy?

The structure is 1,698 ft (517.5 m) long with a longest span of 225 ft (68.6 m) and a deck 33 ft wide.

Who owns Ramp EB13-SB 235 over Ramp Lev RD Wichita Fdwy?

It is owned by the State Highway Agency.