US Bridges

Ramp C-Haskell over North Canal

Good

Douglas County, Kansas · 0.37 MI NE of K-10 · Structure no. 999901000231741

Built
2014
11 years old
Condition
Good
inspected June 2024
Type
Slab
Concrete Continuous
Length
290 ft
5 main spans
Daily traffic
1,475
2023 count
Owner
State
State Highway Agency

About this bridge

Ramp C-Haskell over North Canal is a concrete continuous slab carrying Ramp C-Haskell over North Canal in Douglas County, Kansas. It was built in 2014, so it is 11 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,475 vehicles a day. The structure is 290 ft (88.5 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRamp C-Haskell
CrossesNorth Canal
Location0.37 MI NE of K-10
RouteState Highway 15
StateKansas
Coordinates38.925, -95.21583
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating41.1 US tons
Inventory rating27.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckNot applicable
Main spans5
Design loadHL 93
Structure length290 ft (88.5 m)
Longest span64 ft (19.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,475 (2023)
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp C-Haskell over North Canal built?

It was built in 2014, making it 11 years old in 2025.

What condition is Ramp C-Haskell over North Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Ramp C-Haskell over North Canal carry?

About 1,475 vehicles per day (2023 count).

How long is Ramp C-Haskell over North Canal?

The structure is 290 ft (88.5 m) long with a longest span of 64 ft (19.5 m) and a deck 28 ft wide.

Who owns Ramp C-Haskell over North Canal?

It is owned by the State Highway Agency.