US Bridges

22 Road over Morehouse Canyon

Good

Cheyenne County, Kansas · 12.5N 7.5E St. Francis · Structure no. 000120359003065

Built
2000
25 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
20
2020 count
Owner
County
County Highway Agency

About this bridge

22 Road over Morehouse Canyon is a concrete culvert carrying 22 Road over Morehouse Canyon in Cheyenne County, Kansas. It was built in 2000, so it is 25 years old, younger than the Kansas average of 52.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, projected to reach 25 by 2045. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 6.2 mi (10 km).

Carries22 Road
CrossesMorehouse Canyon
Location12.5N 7.5E St. Francis
RouteCounty Highway 0
StateKansas
Coordinates39.95251, -101.65472
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68 US tons
Inventory rating40.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic20 (2020)
Projected traffic25 by 2045
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 22 Road over Morehouse Canyon built?

It was built in 2000, making it 25 years old in 2025.

What condition is 22 Road over Morehouse Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does 22 Road over Morehouse Canyon carry?

About 20 vehicles per day (2020 count).

How long is 22 Road over Morehouse Canyon?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3.1 m).

Who owns 22 Road over Morehouse Canyon?

It is owned by the County Highway Agency.