23 Road (rs 115) over Pigg Canyon
FairCheyenne County, Kansas · 12.3N 9.0E St. Francis · Structure no. 000000000120080
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 45 ft
- 4 main spans
- Daily traffic
- 15
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
23 Road (rs 115) over Pigg Canyon is a wood or timber stringer/multi-beam or girder carrying 23 Road (rs 115) over Pigg Canyon in Cheyenne County, Kansas. It was built in 1970, so it is 55 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15 vehicles a day, projected to reach 25 by 2045. The structure is 45 ft (13.7 m) long and 24 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 23 Road (rs 115) over Pigg Canyon built?
It was built in 1970, making it 55 years old in 2025.
What condition is 23 Road (rs 115) over Pigg Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does 23 Road (rs 115) over Pigg Canyon carry?
About 15 vehicles per day (2020 count).
How long is 23 Road (rs 115) over Pigg Canyon?
The structure is 45 ft (13.7 m) long with a longest span of 11 ft (3.4 m) and a deck 24 ft wide.
Who owns 23 Road (rs 115) over Pigg Canyon?
It is owned by the County Highway Agency.