US Bridges

Poplar Street over New Thompson Ditch

Good

Vigo County, Indiana · 00.05 W Fruitrdge Ave · Structure no. 8400355

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
73 ft
1 main span
Daily traffic
2,829
2017 count
Owner
County
County Highway Agency

About this bridge

Poplar Street over New Thompson Ditch is a steel stringer/multi-beam or girder carrying Poplar Street over New Thompson Ditch in Vigo County, Indiana. It was built in 2018, so it is 7 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,829 vehicles a day, roughly 2% of them trucks, projected to reach 3,870 by 2037. The structure is 73 ft (22.2 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPoplar Street
CrossesNew Thompson Ditch
Location00.05 W Fruitrdge Ave
RouteCounty Highway 0
StateIndiana
Coordinates39.46286, -87.36098
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating41.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length73 ft (22.2 m)
Longest span72 ft (21.9 m)
Deck width40 ft (12.3 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,829 (2017)
Projected traffic3,870 by 2037
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poplar Street over New Thompson Ditch built?

It was built in 2018, making it 7 years old in 2025.

What condition is Poplar Street over New Thompson Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Poplar Street over New Thompson Ditch carry?

About 2,829 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Poplar Street over New Thompson Ditch?

The structure is 73 ft (22.2 m) long with a longest span of 72 ft (21.9 m) and a deck 40 ft wide.

Who owns Poplar Street over New Thompson Ditch?

It is owned by the County Highway Agency.