US Bridges

Fruitridge Avenue over Thompson Ditch

Good

Vigo County, Indiana · 00.10 N Wallace · Structure no. 8400203

Built
1987
38 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete Continuous
Length
97 ft
3 main spans
Daily traffic
4,235
2017 count
Owner
County
County Highway Agency

About this bridge

Fruitridge Avenue over Thompson Ditch is a concrete continuous slab carrying Fruitridge Avenue over Thompson Ditch in Vigo County, Indiana. It was built in 1987, so it is 38 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,235 vehicles a day, roughly 3% of them trucks, projected to reach 5,793 by 2037. The structure is 97 ft (29.5 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFruitridge Avenue
CrossesThompson Ditch
Location00.10 N Wallace
RouteCity Street 0
StateIndiana
Coordinates39.44548, -87.36006
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.8 US tons
Inventory rating50.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length97 ft (29.5 m)
Longest span37 ft (11.3 m)
Deck width31 ft (9.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,235 (2017)
Projected traffic5,793 by 2037
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fruitridge Avenue over Thompson Ditch built?

It was built in 1987, making it 38 years old in 2025.

What condition is Fruitridge Avenue over Thompson Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Fruitridge Avenue over Thompson Ditch carry?

About 4,235 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Fruitridge Avenue over Thompson Ditch?

The structure is 97 ft (29.5 m) long with a longest span of 37 ft (11.3 m) and a deck 31 ft wide.

Who owns Fruitridge Avenue over Thompson Ditch?

It is owned by the County Highway Agency.