US Bridges

I-69 NB over CR 125 S

Good

Pike County, Indiana · 02.17 S SR 57 · Structure no. 080146

Built
2012
13 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
54 ft
1 main span
Daily traffic
18,595
2010 count
Owner
State
State Highway Agency

About this bridge

I-69 NB over CR 125 S is a prestressed concrete continuous stringer/multi-beam or girder carrying I-69 NB over CR 125 S in Pike County, Indiana. It was built in 2012, so it is 13 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,595 vehicles a day, roughly 26% of them trucks, projected to reach 27,215 by 2030. The structure is 54 ft (16.6 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-69 NB
CrossesCR 125 S
Location02.17 S SR 57
RouteInterstate 69
StateIndiana
Coordinates38.40291, -87.32876
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.8 US tons
Inventory rating34.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length54 ft (16.6 m)
Longest span53 ft (16.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,595 (2010)
Projected traffic27,215 by 2030
Trucks26%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-69 NB over CR 125 S built?

It was built in 2012, making it 13 years old in 2025.

What condition is I-69 NB over CR 125 S in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does I-69 NB over CR 125 S carry?

About 18,595 vehicles per day (2010 count), of which roughly 26% are trucks.

How long is I-69 NB over CR 125 S?

The structure is 54 ft (16.6 m) long with a longest span of 53 ft (16.1 m) and a deck 43 ft wide.

Who owns I-69 NB over CR 125 S?

It is owned by the State Highway Agency.