High School RD over Conrail RR
FairMarion County, Indiana · 00.24 S of Rockville RD · Structure no. 4900199
- Built
- 1960
- 65 years old, rebuilt 1995
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 173 ft
- 3 main spans
- Daily traffic
- 12,567
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
High School RD over Conrail RR is a steel continuous stringer/multi-beam or girder carrying High School RD over Conrail RR in Marion County, Indiana. It was built in 1960 and reconstructed in 1995, so it is 65 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,567 vehicles a day, roughly 2% of them trucks, projected to reach 18,670 by 2039. The structure is 173 ft (52.6 m) long and 40 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was High School RD over Conrail RR built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1995.
What condition is High School RD over Conrail RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does High School RD over Conrail RR carry?
About 12,567 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is High School RD over Conrail RR?
The structure is 173 ft (52.6 m) long with a longest span of 66 ft (20.2 m) and a deck 40 ft wide.
Who owns High School RD over Conrail RR?
It is owned by the City or Municipal Highway Agency.