CR 225 East over Canary Ditch
FairJohnson County, Indiana · 0.10 S of CR 400 N · Structure no. 4100065
- Built
- 1970
- 55 years old, rebuilt 2022
- Condition
- Fair
- inspected June 2024
- Type
- Channel Beam
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 6,115
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
CR 225 East over Canary Ditch is a concrete channel beam carrying CR 225 East over Canary Ditch in Johnson County, Indiana. It was built in 1970 and reconstructed in 2022, so it is 55 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,115 vehicles a day, roughly 10% of them trucks, projected to reach 13,942 by 2041. The structure is 28 ft (8.5 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 225 East over Canary Ditch built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2022.
What condition is CR 225 East over Canary Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does CR 225 East over Canary Ditch carry?
About 6,115 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is CR 225 East over Canary Ditch?
The structure is 28 ft (8.5 m) long with a longest span of 25 ft (7.5 m) and a deck 26 ft wide.
Who owns CR 225 East over Canary Ditch?
It is owned by the City or Municipal Highway Agency.