US Bridges

I-469 WB over Leo Rd. (clinton St.)

Good

Allen County, Indiana · 00.46 E I-69 · Structure no. 076310

Built
1994
31 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
334 ft
4 main spans
Daily traffic
26,107
2023 count
Owner
State
State Highway Agency

About this bridge

I-469 WB over Leo Rd. (clinton St.) is a prestressed concrete continuous tee beam carrying I-469 WB over Leo Rd. (clinton St.) in Allen County, Indiana. It was built in 1994, so it is 31 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,107 vehicles a day, roughly 19% of them trucks, projected to reach 29,606 by 2043. The structure is 334 ft (101.7 m) long and 49 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-469 WB
CrossesLeo Rd. (clinton St.)
Location00.46 E I-69
RouteInterstate 469
StateIndiana
Coordinates41.16822, -85.09539
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating44.3 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length334 ft (101.7 m)
Longest span106 ft (32.3 m)
Deck width49 ft (14.9 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,107 (2023)
Projected traffic29,606 by 2043
Trucks19%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-469 WB over Leo Rd. (clinton St.) built?

It was built in 1994, making it 31 years old in 2025.

What condition is I-469 WB over Leo Rd. (clinton St.) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-469 WB over Leo Rd. (clinton St.) carry?

About 26,107 vehicles per day (2023 count), of which roughly 19% are trucks.

How long is I-469 WB over Leo Rd. (clinton St.)?

The structure is 334 ft (101.7 m) long with a longest span of 106 ft (32.3 m) and a deck 49 ft wide.

Who owns I-469 WB over Leo Rd. (clinton St.)?

It is owned by the State Highway Agency.