US Bridges

I-469 EB over Leo Rd. (clinton St.)

Good

Allen County, Indiana · 00.46 E I-69 · Structure no. 076300

Built
1994
31 years old, rebuilt 2023
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
334 ft
4 main spans
Daily traffic
25,946
2023 count
Owner
State
State Highway Agency

About this bridge

I-469 EB over Leo Rd. (clinton St.) is a prestressed concrete continuous tee beam carrying I-469 EB over Leo Rd. (clinton St.) in Allen County, Indiana. It was built in 1994 and reconstructed in 2023, so it is 31 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,946 vehicles a day, roughly 40% of them trucks, projected to reach 29,424 by 2043. The structure is 334 ft (101.7 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-469 EB
CrossesLeo Rd. (clinton St.)
Location00.46 E I-69
RouteInterstate 469
StateIndiana
Coordinates41.16807, -85.09562
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.5 US tons
Inventory rating39.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length334 ft (101.7 m)
Longest span106 ft (32.3 m)
Deck width62 ft (18.9 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,946 (2023)
Projected traffic29,424 by 2043
Trucks40%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-469 EB over Leo Rd. (clinton St.) built?

It was built in 1994, making it 31 years old in 2025. It was reconstructed in 2023.

What condition is I-469 EB over Leo Rd. (clinton St.) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-469 EB over Leo Rd. (clinton St.) carry?

About 25,946 vehicles per day (2023 count), of which roughly 40% are trucks.

How long is I-469 EB over Leo Rd. (clinton St.)?

The structure is 334 ft (101.7 m) long with a longest span of 106 ft (32.3 m) and a deck 62 ft wide.

Who owns I-469 EB over Leo Rd. (clinton St.)?

It is owned by the State Highway Agency.