Olympic Boulevard over Rock Run Creek
GoodWill County, Illinois · .19 MI W Crossroads · Structure no. 099830100000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 510 ft
- 4 main spans
- Daily traffic
- 500
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Olympic Boulevard over Rock Run Creek is a steel continuous stringer/multi-beam or girder carrying Olympic Boulevard over Rock Run Creek in Will County, Illinois. It was built in 2023, so it is 2 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 80% of them trucks, projected to reach 316 by 2040. The structure is 510 ft (155.4 m) long and 50 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Olympic Boulevard over Rock Run Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Olympic Boulevard over Rock Run Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Olympic Boulevard over Rock Run Creek carry?
About 500 vehicles per day (2024 count), of which roughly 80% are trucks.
How long is Olympic Boulevard over Rock Run Creek?
The structure is 510 ft (155.4 m) long with a longest span of 150 ft (45.7 m) and a deck 50 ft wide.
Who owns Olympic Boulevard over Rock Run Creek?
It is owned by the City or Municipal Highway Agency.