Cordova Road over Drainage Ditch
GoodWhiteside County, Illinois · 4 MI West of Erie · Structure no. 098307100000000
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected March 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 325
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Cordova Road over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying Cordova Road over Drainage Ditch in Whiteside County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 325 vehicles a day, roughly 8% of them trucks, projected to reach 328 by 2046. The structure is 56 ft (17.1 m) long and 30 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cordova Road over Drainage Ditch built?
It was built in 2004, making it 21 years old in 2025.
What condition is Cordova Road over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does Cordova Road over Drainage Ditch carry?
About 325 vehicles per day (2016 count), of which roughly 8% are trucks.
How long is Cordova Road over Drainage Ditch?
The structure is 56 ft (17.1 m) long with a longest span of 53 ft (16.2 m) and a deck 30 ft wide.
Who owns Cordova Road over Drainage Ditch?
It is owned by the County Highway Agency.