FAS 2184 Cordova R over I-88
FairWhiteside County, Illinois · 2.5 Mi. W.Erie · Structure no. 098005500000000
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 465 ft
- 4 main spans
- Daily traffic
- 325
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
FAS 2184 Cordova R over I-88 is a steel continuous stringer/multi-beam or girder carrying FAS 2184 Cordova R over I-88 in Whiteside County, Illinois. It was built in 1975, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 325 vehicles a day, roughly 8% of them trucks, projected to reach 328 by 2046. The structure is 465 ft (141.8 m) long and 38 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 2184 Cordova R over I-88 built?
It was built in 1975, making it 50 years old in 2025.
What condition is FAS 2184 Cordova R over I-88 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does FAS 2184 Cordova R over I-88 carry?
About 325 vehicles per day (2016 count), of which roughly 8% are trucks.
How long is FAS 2184 Cordova R over I-88?
The structure is 465 ft (141.8 m) long with a longest span of 105 ft (31.9 m) and a deck 38 ft wide.
Who owns FAS 2184 Cordova R over I-88?
It is owned by the State Highway Agency.