Cameron Rd-Fas 407 over Cedar Creek
GoodWarren County, Illinois · SW-23-T11NR1W · Structure no. 094302800000000
- Built
- 1979
- 46 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 271 ft
- 4 main spans
- Daily traffic
- 375
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Cameron Rd-Fas 407 over Cedar Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Cameron Rd-Fas 407 over Cedar Creek in Warren County, Illinois. It was built in 1979, so it is 46 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 375 vehicles a day, roughly 7% of them trucks, projected to reach 379 by 2046. The structure is 271 ft (82.6 m) long and 64 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cameron Rd-Fas 407 over Cedar Creek built?
It was built in 1979, making it 46 years old in 2025.
What condition is Cameron Rd-Fas 407 over Cedar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Cameron Rd-Fas 407 over Cedar Creek carry?
About 375 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Cameron Rd-Fas 407 over Cedar Creek?
The structure is 271 ft (82.6 m) long with a longest span of 70 ft (21.3 m) and a deck 64 ft wide.
Who owns Cameron Rd-Fas 407 over Cedar Creek?
It is owned by the County Highway Agency.