Cameron RD over US 34
FairWarren County, Illinois · 2.25M N of Cameron · Structure no. 094002800000000
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 275 ft
- 2 main spans
- Daily traffic
- 675
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Cameron RD over US 34 is a steel continuous stringer/multi-beam or girder carrying Cameron RD over US 34 in Warren County, Illinois. It was built in 1979, so it is 46 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 675 vehicles a day, roughly 12% of them trucks, projected to reach 682 by 2046. The structure is 275 ft (83.9 m) long and 64 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cameron RD over US 34 built?
It was built in 1979, making it 46 years old in 2025.
What condition is Cameron RD over US 34 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Cameron RD over US 34 carry?
About 675 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is Cameron RD over US 34?
The structure is 275 ft (83.9 m) long with a longest span of 107 ft (32.6 m) and a deck 64 ft wide.
Who owns Cameron RD over US 34?
It is owned by the State Highway Agency.