Lunch Rd/ TR 122 over Douglas Creek
FairSt. Clair County, Illinois · 0.2 MI S. Schmidt RD · Structure no. 082405400000000
- Built
- 1923
- 102 years old
- Condition
- Fair
- inspected February 2023
- Type
- Other
- Concrete
- Length
- 38 ft
- 1 main span
- Daily traffic
- 225
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lunch Rd/ TR 122 over Douglas Creek is a concrete other carrying Lunch Rd/ TR 122 over Douglas Creek in St. Clair County, Illinois. It was built in 1923, so it is 102 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 225 vehicles a day, roughly 10% of them trucks, projected to reach 227 by 2046. The structure is 38 ft (11.6 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lunch Rd/ TR 122 over Douglas Creek built?
It was built in 1923, making it 102 years old in 2025.
What condition is Lunch Rd/ TR 122 over Douglas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Lunch Rd/ TR 122 over Douglas Creek carry?
About 225 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Lunch Rd/ TR 122 over Douglas Creek?
The structure is 38 ft (11.6 m) long with a longest span of 37 ft (11.3 m) and a deck 21 ft wide.
Who owns Lunch Rd/ TR 122 over Douglas Creek?
It is owned by the Town or Township Highway Agency.