Douglas-Millstadt over Douglas Creek
FairSt. Clair County, Illinois · 0.5 MI W Il 159 · Structure no. 082309300000000
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 112 ft
- 3 main spans
- Daily traffic
- 3,200
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Douglas-Millstadt over Douglas Creek is a prestressed concrete box beam or girders - multiple carrying Douglas-Millstadt over Douglas Creek in St. Clair County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,200 vehicles a day, roughly 8% of them trucks, projected to reach 3,333 by 2046. The structure is 112 ft (34 m) long and 33 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Douglas-Millstadt over Douglas Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is Douglas-Millstadt over Douglas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Douglas-Millstadt over Douglas Creek carry?
About 3,200 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Douglas-Millstadt over Douglas Creek?
The structure is 112 ft (34 m) long with a longest span of 50 ft (15.2 m) and a deck 33 ft wide.
Who owns Douglas-Millstadt over Douglas Creek?
It is owned by the County Highway Agency.