I-55/64/70 EB Cd " over UPRR
FairSt. Clair County, Illinois · Pier H-1 to Abut H-5 · Structure no. 082025600000000
- Built
- 1969
- 56 years old, rebuilt 1997
- Condition
- Fair
- inspected February 2024
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 406 ft
- 4 main spans
- Daily traffic
- 14,700
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-55/64/70 EB Cd " over UPRR is a steel continuous girder and floorbeam system carrying I-55/64/70 EB Cd " over UPRR in St. Clair County, Illinois. It was built in 1969 and reconstructed in 1997, so it is 56 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,700 vehicles a day, roughly 13% of them trucks, projected to reach 19,493 by 2046. The structure is 406 ft (123.7 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-55/64/70 EB Cd " over UPRR built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 1997.
What condition is I-55/64/70 EB Cd " over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-55/64/70 EB Cd " over UPRR carry?
About 14,700 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is I-55/64/70 EB Cd " over UPRR?
The structure is 406 ft (123.7 m) long with a longest span of 124 ft (37.8 m) and a deck 38 ft wide.
Who owns I-55/64/70 EB Cd " over UPRR?
It is owned by the State Highway Agency.