I-55/64 EB Cd Q-Li over Ground
FairSt. Clair County, Illinois · Pier D26 to Pier P14 · Structure no. 082025500000000
- Built
- 1969
- 56 years old, rebuilt 1990
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 249 ft
- 3 main spans
- Daily traffic
- 16,100
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-55/64 EB Cd Q-Li over Ground is a steel continuous stringer/multi-beam or girder carrying I-55/64 EB Cd Q-Li over Ground in St. Clair County, Illinois. It was built in 1969 and reconstructed in 1990, so it is 56 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,100 vehicles a day, roughly 11% of them trucks, projected to reach 18,281 by 2046. The structure is 249 ft (75.9 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-55/64 EB Cd Q-Li over Ground built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 1990.
What condition is I-55/64 EB Cd Q-Li over Ground in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-55/64 EB Cd Q-Li over Ground carry?
About 16,100 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is I-55/64 EB Cd Q-Li over Ground?
The structure is 249 ft (75.9 m) long with a longest span of 98 ft (29.9 m) and a deck 35 ft wide.
Who owns I-55/64 EB Cd Q-Li over Ground?
It is owned by the State Highway Agency.