FAI 255 over Ill 163
PoorSt. Clair County, Illinois · 1/4 MI S of Il 15 · Structure no. 082023000000000
- Built
- 1980
- 45 years old
- Condition
- Poor
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 127 ft
- 1 main span
- Daily traffic
- 41,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 255 over Ill 163 is a steel stringer/multi-beam or girder carrying FAI 255 over Ill 163 in St. Clair County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 41,500 vehicles a day, roughly 16% of them trucks, projected to reach 45,450 by 2046. The structure is 127 ft (38.6 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 255 over Ill 163 built?
It was built in 1980, making it 45 years old in 2025.
What condition is FAI 255 over Ill 163 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2025.
How much traffic does FAI 255 over Ill 163 carry?
About 41,500 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is FAI 255 over Ill 163?
The structure is 127 ft (38.6 m) long with a longest span of 125 ft (38.1 m) and a deck 121 ft wide.
Who owns FAI 255 over Ill 163?
It is owned by the State Highway Agency.