FAI 255 over Bond Ave
FairSt. Clair County, Illinois · S of Ill 15/MO.AVE · Structure no. 082022800000000
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 107 ft
- 3 main spans
- Daily traffic
- 41,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 255 over Bond Ave is a steel continuous stringer/multi-beam or girder carrying FAI 255 over Bond Ave in St. Clair County, Illinois. It was built in 1979, so it is 46 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 41,500 vehicles a day, roughly 16% of them trucks, projected to reach 45,450 by 2046. The structure is 107 ft (32.5 m) long and 121 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 255 over Bond Ave built?
It was built in 1979, making it 46 years old in 2025.
What condition is FAI 255 over Bond Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does FAI 255 over Bond Ave carry?
About 41,500 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is FAI 255 over Bond Ave?
The structure is 107 ft (32.5 m) long with a longest span of 105 ft (32 m) and a deck 121 ft wide.
Who owns FAI 255 over Bond Ave?
It is owned by the State Highway Agency.