EB Cd to Il 3 SB " over UPRR
FairSt. Clair County, Illinois · Pier D11-> Pier O-17 · Structure no. 082020200000000
- Built
- 1972
- 53 years old, rebuilt 2004
- Condition
- Fair
- inspected January 2024
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 794 ft
- 8 main spans
- Daily traffic
- 7,100
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
EB Cd to Il 3 SB " over UPRR is a steel continuous girder and floorbeam system carrying EB Cd to Il 3 SB " over UPRR in St. Clair County, Illinois. It was built in 1972 and reconstructed in 2004, so it is 53 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,100 vehicles a day, roughly 16% of them trucks, projected to reach 5,555 by 2046. The structure is 794 ft (242 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB Cd to Il 3 SB " over UPRR built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2004.
What condition is EB Cd to Il 3 SB " over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does EB Cd to Il 3 SB " over UPRR carry?
About 7,100 vehicles per day (2024 count), of which roughly 16% are trucks.
How long is EB Cd to Il 3 SB " over UPRR?
The structure is 794 ft (242 m) long with a longest span of 121 ft (36.9 m) and a deck 28 ft wide.
Who owns EB Cd to Il 3 SB " over UPRR?
It is owned by the State Highway Agency.