IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp
FairSt. Clair County, Illinois · Pier P1 to Pier A5 · Structure no. 082014500000000
- Built
- 1969
- 56 years old, rebuilt 2004
- Condition
- Fair
- inspected September 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 1,559 ft
- 15 main spans
- Daily traffic
- 4,950
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp is a steel continuous girder and floorbeam system carrying IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp in St. Clair County, Illinois. It was built in 1969 and reconstructed in 2004, so it is 56 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,950 vehicles a day, roughly 8% of them trucks, projected to reach 8,787 by 2046. The structure is 1,559 ft (475.2 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2004.
What condition is IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp carry?
About 4,950 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp?
The structure is 1,559 ft (475.2 m) long with a longest span of 134 ft (40.8 m) and a deck 28 ft wide.
Who owns IL3NB to 55/64WB " over UPRR a B C Il 3 SB Ramp?
It is owned by the State Highway Agency.