I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo
FairSt. Clair County, Illinois · Pier D1 to Abut D46 · Structure no. 082014400000000
- Built
- 1969
- 56 years old, rebuilt 2021
- Condition
- Fair
- inspected February 2024
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 4,444 ft
- 46 main spans
- Daily traffic
- 24,300
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo is a steel continuous girder and floorbeam system carrying I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo in St. Clair County, Illinois. It was built in 1969 and reconstructed in 2021, so it is 56 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,300 vehicles a day, roughly 7% of them trucks, projected to reach 22,826 by 2046. The structure is 4,444 ft (1,354.5 m) long and 36 ft wide. If it were closed, the detour would be 29.8 mi (48 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2021.
What condition is I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo carry?
About 24,300 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo?
The structure is 4,444 ft (1,354.5 m) long with a longest span of 137 ft (41.8 m) and a deck 36 ft wide.
Who owns I-55/64 EB Cd "d" over UPRR O2 8TH9TH10th Piggo?
It is owned by the State Highway Agency.