US Bridges

Mun 6010 (union ST over Spring Creek

Good

Pike County, Illinois · 0.34 MI S FAS 603 · Structure no. 075333100000000

Built
2024
1 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
114 ft
3 main spans
Daily traffic
150
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mun 6010 (union ST over Spring Creek is a prestressed concrete box beam or girders - multiple carrying Mun 6010 (union ST over Spring Creek in Pike County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 38% of them trucks, projected to reach 353 by 2046. The structure is 114 ft (34.7 m) long and 28 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesMun 6010 (union ST
CrossesSpring Creek
Location0.34 MI S FAS 603
RouteCity Street 0
Coordinates39.43833, -90.79043
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length114 ft (34.7 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2023)
Projected traffic353 by 2046
Trucks38%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mun 6010 (union ST over Spring Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Mun 6010 (union ST over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Mun 6010 (union ST over Spring Creek carry?

About 150 vehicles per day (2023 count), of which roughly 38% are trucks.

How long is Mun 6010 (union ST over Spring Creek?

The structure is 114 ft (34.7 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns Mun 6010 (union ST over Spring Creek?

It is owned by the City or Municipal Highway Agency.