FAU 7531 (bridge S over FAI 72
GoodPiatt County, Illinois · Bridge ST over I-72 · Structure no. 074008900000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 243 ft
- 1 main span
- Daily traffic
- 2,300
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 7531 (bridge S over FAI 72 is a concrete stringer/multi-beam or girder carrying FAU 7531 (bridge S over FAI 72 in Piatt County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,300 vehicles a day, roughly 8% of them trucks, projected to reach 2,323 by 2046. The structure is 243 ft (74.2 m) long and 69 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 7531 (bridge S over FAI 72 built?
It was built in 2024, making it 1 years old in 2025.
What condition is FAU 7531 (bridge S over FAI 72 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does FAU 7531 (bridge S over FAI 72 carry?
About 2,300 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is FAU 7531 (bridge S over FAI 72?
The structure is 243 ft (74.2 m) long with a longest span of 122 ft (37.1 m) and a deck 69 ft wide.
Who owns FAU 7531 (bridge S over FAI 72?
It is owned by the State Highway Agency.