Peabody Road over W Fork Kickapoo CR
GoodPeoria County, Illinois · NE-19-T9NR5E · Structure no. 072522300000000
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Peabody Road over W Fork Kickapoo CR is a prestressed concrete box beam or girders - multiple carrying Peabody Road over W Fork Kickapoo CR in Peoria County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 69 ft (21 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peabody Road over W Fork Kickapoo CR built?
It was built in 2007, making it 18 years old in 2025.
What condition is Peabody Road over W Fork Kickapoo CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Peabody Road over W Fork Kickapoo CR carry?
About 50 vehicles per day (2022 count).
How long is Peabody Road over W Fork Kickapoo CR?
The structure is 69 ft (21 m) long with a longest span of 66 ft (20.1 m) and a deck 30 ft wide.
Who owns Peabody Road over W Fork Kickapoo CR?
It is owned by the Town or Township Highway Agency.