US Bridges

Graham Chapel Road over Trib of Kickapoo CR

Good

Peoria County, Illinois · SE1/4-24-LIMESTONE · Structure no. 072315900000000

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
525
2017 count
Owner
County
County Highway Agency

About this bridge

Graham Chapel Road over Trib of Kickapoo CR is a concrete culvert carrying Graham Chapel Road over Trib of Kickapoo CR in Peoria County, Illinois. It was built in 2023, so it is 2 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 525 vehicles a day, roughly 7% of them trucks, projected to reach 550 by 2027. The structure is 23 ft (6.9 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGraham Chapel Road
CrossesTrib of Kickapoo CR
LocationSE1/4-24-LIMESTONE
RouteCounty Highway 0
Coordinates40.75577, -89.9401
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating98.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length23 ft (6.9 m)
Longest span12 ft (3.6 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic525 (2017)
Projected traffic550 by 2027
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Graham Chapel Road over Trib of Kickapoo CR built?

It was built in 2023, making it 2 years old in 2025.

What condition is Graham Chapel Road over Trib of Kickapoo CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Graham Chapel Road over Trib of Kickapoo CR carry?

About 525 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is Graham Chapel Road over Trib of Kickapoo CR?

The structure is 23 ft (6.9 m) long with a longest span of 12 ft (3.6 m) and a deck 30 ft wide.

Who owns Graham Chapel Road over Trib of Kickapoo CR?

It is owned by the County Highway Agency.