CH-30 over Skillet Fork
FairMarion County, Illinois · 1 MI SW Helm · Structure no. 061303800000000
- Built
- 1915
- 110 years old
- Condition
- Fair
- inspected April 2024
- Type
- Truss - Thru
- Steel
- Length
- 104 ft
- 1 main span
- Daily traffic
- 75
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CH-30 over Skillet Fork is a steel truss - thru carrying CH-30 over Skillet Fork in Marion County, Illinois. It was built in 1915, so it is 110 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 29% of them trucks, projected to reach 76 by 2046. The structure is 104 ft (31.7 m) long and 16 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH-30 over Skillet Fork built?
It was built in 1915, making it 110 years old in 2025.
What condition is CH-30 over Skillet Fork in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does CH-30 over Skillet Fork carry?
About 75 vehicles per day (2022 count), of which roughly 29% are trucks.
How long is CH-30 over Skillet Fork?
The structure is 104 ft (31.7 m) long with a longest span of 100 ft (30.5 m) and a deck 16 ft wide.
Who owns CH-30 over Skillet Fork?
It is owned by the County Highway Agency.