US Bridges

FAS-795 over Poplar Creek

Fair

Marion County, Illinois · 0.5 MI N Helm · Structure no. 061301200000000

Built
1940
85 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
128 ft
3 main spans
Daily traffic
1,000
2022 count
Owner
County
County Highway Agency

About this bridge

FAS-795 over Poplar Creek is a steel continuous stringer/multi-beam or girder carrying FAS-795 over Poplar Creek in Marion County, Illinois. It was built in 1940, so it is 85 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 13% of them trucks, projected to reach 1,111 by 2046. The structure is 128 ft (39 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFAS-795
CrossesPoplar Creek
Location0.5 MI N Helm
RouteCounty Highway 0
Coordinates38.52091, -88.70751
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating47.2 US tons
Inventory rating0 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length128 ft (39 m)
Longest span49 ft (14.9 m)
Deck width28 ft (8.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2022)
Projected traffic1,111 by 2046
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS-795 over Poplar Creek built?

It was built in 1940, making it 85 years old in 2025.

What condition is FAS-795 over Poplar Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does FAS-795 over Poplar Creek carry?

About 1,000 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is FAS-795 over Poplar Creek?

The structure is 128 ft (39 m) long with a longest span of 49 ft (14.9 m) and a deck 28 ft wide.

Who owns FAS-795 over Poplar Creek?

It is owned by the County Highway Agency.