US Bridges

Niggli Rd/ TR 179 over E. Fork Silver Ck

Good

Madison County, Illinois · 2.5 MI N Grantfork · Structure no. 060330500000000

Built
1991
34 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
100
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Niggli Rd/ TR 179 over E. Fork Silver Ck is a prestressed concrete box beam or girders - multiple carrying Niggli Rd/ TR 179 over E. Fork Silver Ck in Madison County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 21% of them trucks, projected to reach 107 by 2046. The structure is 61 ft (18.7 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNiggli Rd/ TR 179
CrossesE. Fork Silver Ck
Location2.5 MI N Grantfork
RouteCounty Highway 0
Coordinates38.85959, -89.63471
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length61 ft (18.7 m)
Longest span59 ft (18 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic107 by 2046
Trucks21%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Niggli Rd/ TR 179 over E. Fork Silver Ck built?

It was built in 1991, making it 34 years old in 2025.

What condition is Niggli Rd/ TR 179 over E. Fork Silver Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Niggli Rd/ TR 179 over E. Fork Silver Ck carry?

About 100 vehicles per day (2021 count), of which roughly 21% are trucks.

How long is Niggli Rd/ TR 179 over E. Fork Silver Ck?

The structure is 61 ft (18.7 m) long with a longest span of 59 ft (18 m) and a deck 28 ft wide.

Who owns Niggli Rd/ TR 179 over E. Fork Silver Ck?

It is owned by the Town or Township Highway Agency.