US Bridges

Fairview Rd/ FAS 3 over Little Silver

Good

Madison County, Illinois · 3.0 MI NE Grantfork · Structure no. 060323200000000

Built
1978
47 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
100
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Fairview Rd/ FAS 3 over Little Silver is a prestressed concrete box beam or girders - multiple carrying Fairview Rd/ FAS 3 over Little Silver in Madison County, Illinois. It was built in 1978, so it is 47 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 14% of them trucks, projected to reach 107 by 2046. The structure is 120 ft (36.6 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFairview Rd/ FAS 3
CrossesLittle Silver
Location3.0 MI NE Grantfork
RouteCounty Highway 0
Coordinates38.84651, -89.62724
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span39 ft (11.9 m)
Deck width30 ft (9.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic107 by 2046
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fairview Rd/ FAS 3 over Little Silver built?

It was built in 1978, making it 47 years old in 2025.

What condition is Fairview Rd/ FAS 3 over Little Silver in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Fairview Rd/ FAS 3 over Little Silver carry?

About 100 vehicles per day (2021 count), of which roughly 14% are trucks.

How long is Fairview Rd/ FAS 3 over Little Silver?

The structure is 120 ft (36.6 m) long with a longest span of 39 ft (11.9 m) and a deck 30 ft wide.

Who owns Fairview Rd/ FAS 3 over Little Silver?

It is owned by the Town or Township Highway Agency.