Pipeline RD over Green River Trib
PoorClosed to trafficLee County, Illinois · 1.5 MI W Brooklyn RD · Structure no. 052410000000000
- Built
- 1970
- 55 years old
- Condition
- Poor
- inspected February 2023
- Type
- Channel Beam
- Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 25
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Pipeline RD over Green River Trib is a concrete channel beam carrying Pipeline RD over Green River Trib in Lee County, Illinois. It was built in 1970, so it is 55 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 25 vehicles a day, projected to reach 25 by 2046. The structure is 30 ft (9.1 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pipeline RD over Green River Trib built?
It was built in 1970, making it 55 years old in 2025.
What condition is Pipeline RD over Green River Trib in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2023.
How much traffic does Pipeline RD over Green River Trib carry?
About 25 vehicles per day (2017 count).
How long is Pipeline RD over Green River Trib?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 26 ft wide.
Who owns Pipeline RD over Green River Trib?
It is owned by the Town or Township Highway Agency.