US Bridges

TR 117 Pipeline RD over Trib of Green River

Good

Lee County, Illinois · 1.5 MI W Brooklyn RD · Structure no. 052410400000000

Built
2024
1 years old
Condition
Good
inspected February 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
25
2017 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 117 Pipeline RD over Trib of Green River is a prestressed concrete box beam or girders - multiple carrying TR 117 Pipeline RD over Trib of Green River in Lee County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 25 by 2044. The structure is 55 ft (16.8 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 117 Pipeline RD
CrossesTrib of Green River
Location1.5 MI W Brooklyn RD
RouteCounty Highway 0
Coordinates41.78696, -89.17838
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation*: *
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating—
Inventory rating—

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length55 ft (16.8 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2017)
Projected traffic25 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR 117 Pipeline RD over Trib of Green River built?

It was built in 2024, making it 1 years old in 2025.

What condition is TR 117 Pipeline RD over Trib of Green River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does TR 117 Pipeline RD over Trib of Green River carry?

About 25 vehicles per day (2017 count).

How long is TR 117 Pipeline RD over Trib of Green River?

The structure is 55 ft (16.8 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns TR 117 Pipeline RD over Trib of Green River?

It is owned by the Town or Township Highway Agency.