US Bridges

FAP-327/FR-1699 over Allison Ditch No 1

Poor

Lawrence County, Illinois · 2 MI E Airport Int · Structure no. 051003300000000

Built
1957
68 years old, rebuilt 1960
Condition
Poor
inspected June 2024
Type
Channel Beam
Concrete
Length
56 ft
3 main spans
Daily traffic
20
2021 count
Owner
State
State Highway Agency

About this bridge

FAP-327/FR-1699 over Allison Ditch No 1 is a concrete channel beam carrying FAP-327/FR-1699 over Allison Ditch No 1 in Lawrence County, Illinois. It was built in 1957 and reconstructed in 1960, so it is 68 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 20 vehicles a day, roughly 5% of them trucks, projected to reach 20 by 2046. The structure is 56 ft (17.1 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFAP-327/FR-1699
CrossesAllison Ditch No 1
Location2 MI E Airport Int
Coordinates38.71779, -87.59435
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Superstructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating42.9 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 15
Structure length56 ft (17.1 m)
Longest span23 ft (7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2021)
Projected traffic20 by 2046
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP-327/FR-1699 over Allison Ditch No 1 built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1960.

What condition is FAP-327/FR-1699 over Allison Ditch No 1 in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.

How much traffic does FAP-327/FR-1699 over Allison Ditch No 1 carry?

About 20 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is FAP-327/FR-1699 over Allison Ditch No 1?

The structure is 56 ft (17.1 m) long with a longest span of 23 ft (7 m) and a deck 26 ft wide.

Who owns FAP-327/FR-1699 over Allison Ditch No 1?

It is owned by the State Highway Agency.