US Bridges

TR 113 over Drainage Ditch

Good

Kankakee County, Illinois · 17750E 0000N · Structure no. 046349100000000

Built
2007
18 years old
Condition
Good
inspected May 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
33 ft
1 main span
Daily traffic
75
2002 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 113 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR 113 over Drainage Ditch in Kankakee County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 77 by 2046. The structure is 33 ft (10.1 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 113
CrossesDrainage Ditch
Location17750E 0000N
RouteCounty Highway 0
Coordinates41.12139, -87.53148
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span32 ft (9.8 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2002)
Projected traffic77 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 113 over Drainage Ditch built?

It was built in 2007, making it 18 years old in 2025.

What condition is TR 113 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does TR 113 over Drainage Ditch carry?

About 75 vehicles per day (2002 count).

How long is TR 113 over Drainage Ditch?

The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.

Who owns TR 113 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.